Multi-Hazard Design Considerations
The change to 10-year wind serviceability drift limits may impact the “governing” hazard for member sizing, depending on current office design practice.
Is there any bias in an owner’s expectations of performance for wind versus seismic hazards?
Performance objectives for wind and seismic design may not necessarily converge on a mutually optimized solution.
Notes: