•For building with strong asymmetry in plan, or with numerous non-orthogonal elements, a planar (two dimensional) push-over analysis may not suffice.
•For such cases a 3D model of the building
must be constructed and subjected to
push-over analysis.
•Three dimensional buildings
may be
pushed in the principal directions
independently, or
pushed
simultaneously in
orthogonal
directions.