•For R/C members of existing structures, it is very important to note the development lengths when calculating member capacities.
•If inadequate development lengths are present, as they are in most of the older buildings, the contributing steel area should be reduced to account for this inadequacy.
•Failure to do so will result in overestimating the actual capacity of the members and results in an inaccurate push-over curve.